Wind RowWalk the rowWalk
A row of wind turbines standing over ploughed green crop rows at first light
0.0 MW
Calm · 2 m/sthe row · twelve turbines · this minute

Infrastructure as landscape.

Twelve turbines in a row. A footpath beneath them. A farm that still farms.Energy landscapes designed to be walked through, not fenced off. We site turbines the way you'd site a line of poplars, and we ask the village first.

Walk the row
01 · The row

Twelve turbines, one wind.

0 homes
powered this minute · of 3,400
Calm2 m/s · blades feathered
Breeze6 m/s · cut-in
Fresh11 m/s · rated
Gale25 m/s · cut-out
Calm. The blades are feathered.Two metres a second. Nothing turns. The footpath is busiest on days like this, because you can hear the skylarks. That was in the brief.
Wind turbines standing above a sea of cloud at sunrise
02 · The numbers

What a row gives back.

12

turbines, one line, following the ridge. Never a grid. A grid reads as a factory.

4.2 MW

each, rated. Fifty megawatts on a fresh day. The village uses two.

30 yr

design life. Then the towers come down and the footpath stays. It's in the lease.

1

footpath through the row, open always. No fence. A gate with a latch and a bench at the top.

A white turbine blade and hub seen from directly below against blue sky

Infrastructure as landscape.

A turbine is eighty metres of white against the sky. You can hide it, badly, or place it, well. We place it: on the ridge line, spaced like trees, with the footpath running under so people know what it is.

Projects

Three rows. Three landscapes.

Each one was sited with the parish, walked with the ramblers, and drawn onto a map the farmer already had on the wall.

Ridge · 12 turbines · 50 MWThe Ridge RowFollowing a chalk escarpment, spaced at 400 m, a bridleway beneath

The original. Twelve turbines in a line you can see from the train, and the bench at the top is the busiest seat in the county.

Commissioned 2019
Valley · 8 turbines · 34 MWThe Water RowAlong a reservoir dam, mirrored in it on still days

Eight, not twelve, because the dam is eight turbines long. The path follows the dam top. Anglers stayed.

Commissioned 2022
Coast · 16 turbines · 67 MWThe Shore RowOnshore, along the dune line, set back from the beach

Sixteen along a dune spine, with the coast path threaded between. The village asked for two fewer. We took out two.

Commissioning 2027
Consultation

How a row gets sited.

Two years of walking before anything's built. Here's the order it happens in.

A single wind turbine on a golden hillside under a pale sky
Yr 0
Walk it with the villageBefore a drawing exists. Where people walk, where they look from, what they'd hate. Written down.
Yr 0
A year of windA mast on the ridge for twelve months. If the wind isn't there, neither are we. Twice, it wasn't.
Yr 1
Draw the lineOne row, following what's already there: a ridge, a dam, a dune. Spaced by eye first, then by the engineers.
Yr 1
The footpath firstDesigned before the turbine bases. Gate, bench, waymarks. The path is the point of the landscape; the turbines are what pays for it.
Yr 2
Build in a seasonBases in spring, towers in summer, blades in a week of still weather. The path reopens the day the cranes leave.
Open days

Walk the row.

First Sunday of the month, from the car park at the bottom of the Ridge Row. An engineer walks with you, opens a tower door, and answers the question about birds. Bring boots. Dogs on leads under the blades.

Walk the row