Twelve weeks. One instructor to six. Forty soldered joints a day.A plumbing school that starts with copper, a torch and a bucket, and doesn't hand you a push-fit fitting until you can sweat a joint you can't see. Water is patient. It waits for the bad joint.
Apply for a placefull time, on the benches. Copper, then plastic, then a bathroom, then a boiler.
instructor to students. Every joint looked at. Every leak found before you find it in someone's kitchen.
joints a day in week one. By week three you stop counting. By week twelve you stop looking.
push-fit until week five. If you can't solder blind under a sink, you can't be trusted with the easy stuff either.
That's the whole trade. Pressure, gravity, and a route you drew. Everything else is being neat about it and being honest about the joint you're not sure of.
Foundation for everyone, heating for the ones who stay, and a two-week refresher for the ones who've been doing it wrong for years.
The course. Weeks one to four are copper and a torch. Week five you're allowed a push-fit. Week twelve you fit a bathroom that has to pass a pressure test with the instructor watching.
Wet systems from the cylinder to the last radiator. Balancing by hand with a thermometer and patience. Ends with a system you designed running hot.
Ten days of copper. Soldering blind, bending by hand, 22 mm and 28 mm. Most people arrive embarrassed and leave with forty good joints a day.
Not the regulations. Those are in a book. These are the things that aren't.
Eight places a course, four courses a year. Tell us why, and whether you've held a torch. Neither answer disqualifies you. We'll invite you in for a morning on the bench before either of us commits.
Apply for a place